What second-line actually means

Second-line risk and assurance work has a reputation for slowing things down. Twenty years inside regulated institutions taught me the opposite: the best second-line work makes delivery faster, because it catches the expensive mistake before it’s built, not after it’s shipped and someone has to unwind it.

That’s the model behind Independent Delivery Assurance — an outside, experienced read on whether a major programme is actually on track, reporting to the sponsor or board rather than to programme leadership. Not because programme managers are dishonest — because the person telling the board “we’re on track” is usually the person accountable for it being on track, and that’s a structural conflict worth correcting with genuine independence, not a caveat in the status report.

Direct access to the person doing the assessment, no account handlers, no work delegated down to someone more junior — because that’s how it worked when it worked well inside a firm, too.

Previous
Previous

The March 2025 deadline has passed — has your programme actually kept up?

Next
Next

Third-party risk isn’t a spreadsheet problem